Lincoln Fields Transit Way Rehabilitation
Value:
$279,000
Project Year: 2007
|
|
This $279,000 project for OC Transpo required PCS General Contractors
to waterproof the existing link bridges at the Lincoln Fields transit
way station. This required PCS to pressure wash the existing structures
prior to applying a water sealer as well as removing, cleaning and
installing the pressure caps and architectural caps to the windows.
As part of the project, PCS also epoxy the existing concrete floor
and replaced the expansion joints on the structures.